Our new range of electrofusion fittings have been designed to significantly improve installation time on site. One-Weld reduces the amount of pipe preparation time required and allows both the primary and secondary joints to be welded simultaneously in one weld cycle.
4 welds within one electrofusion cycle
Saving significant installation time (average 15 minutes per fitting)
Designed for use with Secondary contained close fit pipe